Today we framed out the chicken run.
Orin helped me dig the holes for the 4x4's,
passed me screws when I needed them, and refilled our drinks.
When he lost interest in being my assistant,
he buried his legs under the pile of sandy dirt that we dug out
to level the ground.
Needless to say, after a hard day's work we both headed for a shower.
Next step: framing out a door.
Orin helped me dig the holes for the 4x4's,
passed me screws when I needed them, and refilled our drinks.
When he lost interest in being my assistant,
he buried his legs under the pile of sandy dirt that we dug out
to level the ground.
Needless to say, after a hard day's work we both headed for a shower.
Next step: framing out a door.
No comments:
Post a Comment